Performance
Results are reported in R (multiples of the planned risk) after costs. All outcomes count, including expired and skipped signals.
Historical simulation over stored data with the same engine, costs and outcome policy. In-sample for research.
No backtest results for RM-DIGITAL-BASELINE-1 yet
An editor can run a backtest from the Research Lab.
Past results, simulated or live, do not guarantee future results. Methodology: how Rheinmarx measures signals.